UDIA raised concern about the overall SIC charge and infrastructure funding required, both from the SIC and 7.12 local contribution plans to deliver the precincts, which requires significant open space.
UDIA raised concern about the overall SIC charge and infrastructure funding required, both from the SIC and 7.12 local contribution plans to deliver the precincts, which requires significant open space.