Building Blocks 

The objective of the study is to identify infrastructure that can unlock dwellings within a two to three-year timeframe. Therefore, only zoned or exhibited release areas at the time of the commencement of the study have been investigated. This is because the time taken to run through the rezoning, development application, detailed design, construction and registration would typically be beyond this timeframe. Similarly, we have not investigated some of the major infrastructure such as a new Wastewater (Sewer) Treatment Plant for the same reason.
 
To reiterate, the purpose of this study is to identify infrastructure that can be delivered in a timely manner to unlock development in the shortest time possible, whilst delivering the maximum number of dwellings per dollar spent on infrastructure.